3. The continuous timing method is used to direct time study a manual task cycle consisting of four elements: a,b,c, and d. Two parts are produced each cycle. Element d is an irregular element performed once every six cycles. All elements were performance rated at 90%. The PFD allowance is 11%. Determine (a) the normalized time for the cycle and (b) the standard time per part. (c) If the worker completes 844 parts in an 8-hour shift during which she works 7 hours and 10min, what is the worker's