Question: Balance the assembly line using Largest Candidate Rule method using the data in Table B and determine the idle time at each station. The cycle

Balance the assembly line using Largest Candidate Rule method using the data in Table B and determine the idle time at each station. The cycle time for meeting the demand is 40 minutes (10 marks). Table B Operation Time (min) Immediate predecessors A 8 - B 5 - C 24 A, B D 16 C E 22 C F 27 D G 10 E H 13 G