Question: Balance the assembly line using Largest Candidate Rule method using the data in Table B and determine the idle time at each station. The cycle

Balance the assembly line using Largest Candidate

Balance the assembly line using Largest Candidate Rule method using the data in Table B and determine the idle time at each station. The cycle time for meeting the demand is 40 minutes (10 marks). Table B Operation Time (min) Immediate predecessors A 3 B 5 10 A, B D 13 E 22 C 27 D G 24 E I 16 G