Question: Consider the following work breakdown structure for a project: Activity Start Node Finish Node Optimistic Time Most Likely Time Pessimistic Time A 1 2 151

Consider the following work breakdown structure

Consider the following work breakdown structure for a project: Activity Start Node Finish Node Optimistic Time Most Likely Time Pessimistic Time A 1 2 151 60 59 B 1 3 54 60 76 C 2 4 158 70 82 D 4 32 |48 144 5 What is the probability that this project will be completed within 135 days