Question: Draw out the critical path in the project using AON. Question 1 Consider the following project information: Table A. Activity Predecessor Total Float Duration in

Draw out the critical path in the project usingDraw out the critical path in the project using

Draw out the critical path in the project using AON.

Question 1 Consider the following project information: Table A. Activity Predecessor Total Float Duration in Weeks Resource Hours Needed/Week Total Resources Required A 3 6 18 B 5 A 2 4 20 7 A 4 28 D 3 3 B, C 6 18 E 5 B 4 2 10 F 4 D 4 16 2 5 3 6 H 5 E, F, G 6 30 Total 146