Question: Draw S curve before and after leveling. (1) 4 Table below presents the activities of a project. Needed Resources (man) Number Activity Duration (day) Pre-Requisite

Draw "S" curve before and after leveling. (1) 4 Draw "S" curve before and after leveling. (1)
4 Table below presents the activities of a project. Needed Resources (man) Number Activity Duration (day) Pre-Requisite Man/day Cumulative 1. A 1 4 2. B 5 A 1 5 3. 1 D 6 1 5. E 16 16 6. 4 E 7. 10 E 1 8. H F, B, D 6 A 6 4. 6 A F 4 10 4