Question: Draw the cpm network with path duration and determine the critical path 76405 The activity table is given below 22/0519 Activity Predecessor Clear site Survey

Draw the cpm network with path duration and determine the critical path

Draw the cpm network with path duration and

76405 The activity table is given below 22/0519 Activity Predecessor Clear site Survey and layout Rough grade Drill wel Water tank foundations 3-9 Excavate sewer 7 3-10 Excavate electrical manholes 3-12 Pole line 4-5 Well pump 2 a. Draw the CPM network with path duration and determine the critical path b. Draw the CPM path with ES, EF,LS,LF and determine the critical path (10) Duration ON 2 2 H 4 P 1 UD N 6 OM un N N N N