Question: The time to load a starting work part into the production machine in a certain unit production operation = 0.7 min, the actual processing time

The time to load a starting work part into the production machine in a certain unit production operation = 0.7 min, the actual processing time in the operation = 3.27 min, and the time to unload the finished part = 0.7 min. In addition, the tool must be changed every 10 cycles and the tool change time = 1.7 min. What is the cycle time (minutes) for the unit operation?