Question: 27. The time to load a starting work part into the production machine in a certain unit production operation = 0.40 min, the actual processing

27. The time to load a starting work part into
27. The time to load a starting work part into
27. The time to load a starting work part into the production machine in a certain unit production operation = 0.40 min, the actual processing time in the operation = 3.10 min, and the time to unload the finished part = 0.20 min. In addition, the tool must be changed every 5 cycles and the tool change time = 1.50 min. The cycle time for the unit operation is which one of the following? (a) 3.5 min (b) 3.7 min (c) 4.0 min (d) 4.5 min (e) 5.2 min 28. If the initial cost of a production machine including installation is $250,000, and the planned use of the machine is 2000 helyr for 5 years, and the applicable overhead rate on the equipment is 50%, which one of the following is the corresponding cost rate of this machine in S/hr? (a) $0.625 (b) $25.00 (c) $37.50 (d) $50.00 (0) $125.00

Step by Step Solution

There are 3 Steps involved in it

1 Expert Approved Answer
Step: 1 Unlock blur-text-image
Question Has Been Solved by an Expert!

Get step-by-step solutions from verified subject matter experts

Step: 2 Unlock
Step: 3 Unlock

Students Have Also Explored These Related General Management Questions!