Question: 6. The data of a small project is shown below. Assuming a $1,000/ day indirect cost, determine: (a) the optimum project duration that minimizes total
6. The data of a small project is shown below. Assuming a $1,000/ day indirect cost, determine:
(a) the optimum project duration that minimizes total project cost; and
(b) the optimum strategy to meet an IS-day deadline.