Question: 1. Consider the project information in the table below, and draw and analyze a proje answer the following sub-questions. Task Duration (days) Immediate Predecessors A

1. Consider the project information in the table
1. Consider the project information in the table below, and draw and analyze a proje answer the following sub-questions. Task Duration (days) Immediate Predecessors A 3 B 6 1 A 2 B UAMU 1 B 5 E 6 C.D.F E 2. (1) Find the Early Start Early Finish Time of Each Activity (2) Find the Late Start / Late Finish Time of Each Activity (3) Calculate the SLACK in each activity (4) Identify the critical path TL DOT Tonning bid on art balan