Question: PERT Problem Analyze the same problem with probabilistic activity times given. Activity Immediate Most Most Most Expected Variance Predecessors Optimistic Likely Pessimistic Time Time Time

PERT Problem Analyze the same problem with probabilistic activity times given. Activity Immediate Most Most Most Expected Variance Predecessors Optimistic Likely Pessimistic Time Time Time Time (ET) A 2 3 6 B A 3 4 5 C B 1 2 4 D B 3 5 6 E 3 4 5 F D 3 3 4 G E,F 1 2 3 Step 1. Calculate the expected time for each activity. Step 2. Identify the different paths in the network and total activity time on path. (Use the expected times of each activity for this calculation). Path 1: Time: Path 2: Time: Step 3. Identify the critical path(s) on the network. The critical path is the one having the longest total activity times AND also has no slack. Critical Path: Total Time: 185
Step by Step Solution
There are 3 Steps involved in it
1 Expert Approved Answer
Step: 1 Unlock
Question Has Been Solved by an Expert!
Get step-by-step solutions from verified subject matter experts
Step: 2 Unlock
Step: 3 Unlock
