Question: Problem 1 The continuous timing method in direct time study was used to obtain the elements. Elements ( a ) ( 2 ?minutes ) ?and

 Problem 1 The continuous timing method in direct time study was
Problem 1
The continuous timing method in direct time study was used to obtain the elements. Elements ( a ) ( 2 ?minutes ) ?and Element ( b ) ( 4 ?minutes ) ?are operator controlled and external to the machine cycle, and they were performance rated at 8 0 % . ?Element ( c ) ( 3 ?minutes ) ?is a machine - controlled element and the time is constant. If the machine cycle allowance is 1 0 % , ?and the worker PFD allowance is 1 5 % , ?determine ( a ) ?the normal time, ( b ) ?the standard time for the cycle. )
Problem 2
Nine cycles have been observed during a direct time study. The mean for the largest element time is 1 . 0 ?minutes, and the corresponding sample standard deviation is 0 . 1 2 ?minute, which was also the largest. If the analyst wants to be 9 5 % ?confident that the mean of the sample was within + - 0 . 1 0 % ?of the true mean many more observations should be taken.
used to obtain the elements. Elements ( a ) ( 2 ?minutes

Step by Step Solution

There are 3 Steps involved in it

1 Expert Approved Answer
Step: 1 Unlock blur-text-image
Question Has Been Solved by an Expert!

Get step-by-step solutions from verified subject matter experts

Step: 2 Unlock
Step: 3 Unlock

Students Have Also Explored These Related General Management Questions!