Question: Question 1 0 ( 1 point ) The expected activity time in PERT analysis is calculated as the sum of the activity variances, divided by
Question point
The expected activity time in PERT analysis is calculated as
the sum of the activity variances, divided by six.
the simple average of the optimistic, pessimistic, and most likely times. the weighted average of and with weighted times as heavily as a and b
the sum of the optimistic, pessimistic, and most likely times.
the sum of the optimistic, pessimistic, and most likely times, divided by six.