Question: he expected activity time in P . ERT analysis is calculated as: the simple average of the optimistic, pessimistic, and most likely times. the sum
he expected activity time in PERT analysis is calculated as:
the simple average of the optimistic, pessimistic, and most likely times.
the sum of the optimistic, pessimistic, and most likely times.
the sum of the optimistic, pessimistic, and most likely times, divided by six.
the weighted average of and with weighted times as heavily as a and
the sum of the activity variances, divided by six.