Question: Activity Description Precede Time A Requirement analysis 5 - B System design 15 A C System programing 25 B D Telecom 15 B E Hardware
| Activity | Description | Precede | Time |
| A | Requirement analysis | 5 | - |
| B | System design | 15 | A |
| C | System programing | 25 | B |
| D | Telecom | 15 | B |
| E | Hardware installation | 30 | B |
| F | Integration | 10 | C,D |
| G | System testing | 10 | E,F |
| H | Training/support | 5 | G |
| I | Hand over and go-live | 5 | H |
Based on the above data perform the following task
- Construct the network diagram
- Determine the number of possible phases
- Calculate the total expected time duration of project
- Determine the critical path
- Drive the ES,LS,EF and LF for each task using task box