Question: Design a PERT Chart based on the activities below and be sure to include the ECT, LAT, slack time for each node, along with the
Design a PERT Chart based on the activities below and be sure to include the ECT, LAT, slack time for each node, along with the critical path.
Activity Predecessor Duration (days)
A NONE 2
B A 3
C A 2
D C 4
E B 1
F B 2
G F 3
H D, E 3
I G 4
J H, I 5
Step by Step Solution
There are 3 Steps involved in it
Get step-by-step solutions from verified subject matter experts