Question: PERT HOMEWORK #4 Design a PERT Chart based on the activities below and be sure to include the ECT, LAT, slack time for each node,

PERT HOMEWORK #4 Design a PERT Chart based on the activities below and be sure to include the ECT, LAT, slack time for each node, along with the critical path. Activity Predecessor Duration (days) NONE A NONE NONE C D B. E NW WA A K NW NWAANA G, H L. M